Our commissioning process is structured around establishing that systems have been correctly set to work, regulated and tested and that the required operating conditions have been achieved. For air distribution systems, our methodology can be aligned with CIBSE Commissioning Code A: Air Distribution Systems (2024), which covers the setting to work, functional testing and regulation of ventilation and ductwork systems. CIBSE also identifies the importance of commissioning planning, system inspection, functional testing, regulation, performance testing and documentation. Where appropriate, BSRIA BG 49 – Commissioning Air Systems and other relevant industry guidance can also be considered alongside the project specification and design requirements.